Our day began with a fresh shipment of lumber.
The holes have been dug halfway at this point. We need to spend the entire day digging out to the four feet to get below the frost line.
The shed is painted.
It was a really hot day, so we took lots of water breaks.
This is also a very good post which I really enjoyed reading. It is not every day that I have the possibility to see something like this.. abbruch
ReplyDelete